After service T825 (the new Timetable from 1 July 2007), the ktt Through Train was back to Fo Tan Depot – Ho Tung Lau and pass the Sha Tin Station. Time: 11:06pm Date?2/7/2007 Canon G7 30 fps 320×240 standard Place: Sha Tin Station
Video Rating: 4 / 5
TheNorthbound Ktt with red head Through Train after service T827 was pass the Tai Wai Station back to Fo Tan Depot – Ho Tung Lau. And at the same time, the Southbound Through Train T811 (the new Timetable from 21 Dec 2008) DF11 0025 + 25Z in the night time pass the Tai Wai Station too. Time: 11:11 pm Date?23/12/2008 Canon G9 30 fps 640×480 standard Place: Tai Wai Station Software: Apple iMovie 7.1.4
Video Rating: 4 / 5
